Skip to main content

Construction Division

Fieldwork Investigation

To support landscaping plans, certain stages require  an inventory of on-site data.

Civil & Infrastructure Engineering Study

Conduct studies that cover a wide range of issues,  including architecture, building structures, road  pavement, bridges, culverts, port and jetty facilities,  coal handling facilities, and mine camp facilities.


Mine Geotechnical Study

Conducted the  advanced stage following the results of the fieldwork  investigation, which was subsequently reviewed by a  geotechnical expert.


Water Management & Engineering Study

Reports on hydrological and hydrogeological investigations, as well as surface water management,  are examples of the types of investigative papers we  provide.


WORK EXPERIENCE


SUPPLY OF WORKS AND SERVICES FOR CLARIFIER POND BALINGIAN POWER GENERATION SDN BHD 


PROJECT OVERVIEW

  • Mobilization and Site Preparation
  • Excavation & Transfer of ash clarifier / run off pond to commissioning / initial pond – 65,000m3
  • Levelling and spreading of ash to avoid spillage in  commissioning pond/initial
  • Clearing blockages in eight (8) UPVC 250mm  diameter overflow pipes (clarifier and main pond)
  • To make good of the commissioning/initial pond for storage and to avoid  spillage.
  • Clearing of the ash discharged at the scum boom/overflow pipe of the  clarifier/run off pond.
  • Clearing of the ash discharged at the scum boom/overflow pipe area of the main  ash pond.
  • Clearing of the blockages in all eight (8) UPVC overflow pipes of 250 mm diameter  located at the scum boom area for the clarifier/run off and main ash pond.
  • Recovery of road access in between the commissioning pond and clarifier/run off  pond.



CIVIL WORKS – DRAINAGE & IRIGRATION  

JPS- Batang Kali Flood Mitigation project: 

Completed in Dec 2024


PROJECT OVERVIEW

  • Batang Kali River flows from Genting Highlands to Batang Kali town.
  • Total length of the river is about 35 km.
  • Project working limits approximately 3.4km.
  • Cement area of the river is around 15,000hectares.
  • Work started in June 2023 and is estimated to be completed by December 2024.


SCOPE OF WORK:

  • Widening of Batang Kali River
  • Deepening of Batang Kali River
  • Construction of New Riverbanks for Batang  Kali River
  • New Drainage Outlet
  • New Suspension Bridge
  • Installation of New Siren Station

BUSINESS ASSET

Rotary Drilling Rig TR580D

Rotary Drilling Rig TR550D

Rotary Drilling Rig TR400D

Rotary Drilling Rig TR360D

Crawler Crane CQUY1500

Crawler Crane CQUY800

Excavator YC210LC/8

Loader SDLG952H